User Tools

Site Tools


usage:nodes:demo_signal

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
usage:nodes:demo_signal [2022-02-26 16:36]
56independent Croxleigh is not a terminus - trains run through. Whoops!
usage:nodes:demo_signal [2022-05-31 23:17] (current)
56independent Resize for both examples to fit together
Line 8: Line 8:
 Below is a use of them in an interchange station, where there is no space for signals on the ground. Below is a use of them in an interchange station, where there is no space for signals on the ground.
  
-{{:usage:nodes:demo_signals_use.png|400}}+{{:usage:nodes:demo_signals_use.png?400|}} 
 + 
 +And here is a use on a quadruple track viaduct, where demo signals provide clear, unambiguous signalling for trains: 
 + 
 +{{:usage:nodes:demo_signal_use_on_quad_track.png?400|}}
  
usage/nodes/demo_signal.1645889775.txt.gz · Last modified: 2022-02-26 16:36 by 56independent