User Tools

Site Tools


usage:interlocking:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
usage:interlocking:start [2021-04-28 14:31]
orwell fallback state is implemented
usage:interlocking:start [2021-09-10 11:16]
orwell refer old manual
Line 1: Line 1:
 ====== Interlocking System ====== ====== Interlocking System ======
 This is an extension of advtrains that aims to provide a feature-rich implementation of an interlocking system for advtrains railways. This is an extension of advtrains that aims to provide a feature-rich implementation of an interlocking system for advtrains railways.
 +
 +The information on the wiki is incomplete. For now, refer to the old interlocking manual: [[https://advtrains.de/interlocking]]
  
 ===== Motivation ===== ===== Motivation =====
Line 44: Line 46:
   * A "Signalbox Panel" view, like [[https://upload.wikimedia.org/wikipedia/commons/5/5b/Ausschnitt.png|this]]   * A "Signalbox Panel" view, like [[https://upload.wikimedia.org/wikipedia/commons/5/5b/Ausschnitt.png|this]]
   * Distant Signals (already reserved in signal aspect, but nothing else done yet)   * Distant Signals (already reserved in signal aspect, but nothing else done yet)
-  * Cab signalling (head-up display in train) 
  
  
usage/interlocking/start.txt · Last modified: 2021-11-03 17:45 by 56independent