This shows you the differences between two versions of the page.
Next revision | Previous revision Last revision Both sides next revision | ||
usage:interlocking:start [2020-02-23 15:57] orwell created |
usage:interlocking:start [2021-09-10 11:16] orwell refer old manual |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Interlocking System ====== | ====== Interlocking System ====== | ||
This is an extension of advtrains that aims to provide a feature-rich implementation of an interlocking system for advtrains railways. | This is an extension of advtrains that aims to provide a feature-rich implementation of an interlocking system for advtrains railways. | ||
+ | |||
+ | The information on the wiki is incomplete. For now, refer to the old interlocking manual: [[https:// | ||
===== Motivation ===== | ===== Motivation ===== | ||
Line 42: | Line 44: | ||
* The current route programming procedure can be very cumbersome, especially for large stations, where the number of routes to be programmed is exponential in the number of tracks in the station, or if the locations of switches and TCBs are far apart from each other. A proposal for a simplification is yet to be written. | * The current route programming procedure can be very cumbersome, especially for large stations, where the number of routes to be programmed is exponential in the number of tracks in the station, or if the locations of switches and TCBs are far apart from each other. A proposal for a simplification is yet to be written. | ||
- | * A facility to reset components to a " | ||
* A " | * A " | ||
* Distant Signals (already reserved in signal aspect, but nothing else done yet) | * Distant Signals (already reserved in signal aspect, but nothing else done yet) | ||
- | * Cab signalling (head-up display in train) | ||