This shows you the differences between two versions of the page.
Next revision | Previous revision Next revision Both sides next revision | ||
usage:interlocking:start [2020-02-23 15:57] orwell created |
usage:interlocking:start [2021-04-28 14:32] orwell distant signalling is implemented too |
||
---|---|---|---|
Line 42: | Line 42: | ||
* The current route programming procedure can be very cumbersome, especially for large stations, where the number of routes to be programmed is exponential in the number of tracks in the station, or if the locations of switches and TCBs are far apart from each other. A proposal for a simplification is yet to be written. | * The current route programming procedure can be very cumbersome, especially for large stations, where the number of routes to be programmed is exponential in the number of tracks in the station, or if the locations of switches and TCBs are far apart from each other. A proposal for a simplification is yet to be written. | ||
- | * A facility to reset components to a " | ||
* A " | * A " | ||
* Distant Signals (already reserved in signal aspect, but nothing else done yet) | * Distant Signals (already reserved in signal aspect, but nothing else done yet) | ||
- | * Cab signalling (head-up display in train) | ||